May 2017

 
Many mission-critical networks, including those in the factory automation industry, are dependent on multicast communication. Unexpected disruptions to these networks can require recovery times of up to 125 seconds, which will often cause the PLC to shut down. Learn how Moxa can ensure fast recovery times for multicast transmissions without requiring network operators to perform complicated configurations or incur additional costs.
 
Integrating a diesel generator with the large variety of diesel generator monitoring systems (DGMSs) or programmable logic controllers (PLCs) can be a hard nut to crack. The job is complicated by the many different communication protocols and interfaces used in the industry, laborious pre-configuration methods, and time-consuming troubleshooting. This month, we cover more about the solutions that simplify integration.
 
 
 
 
 
 
   
 
Application Guide
White Paper
White Paper
 
Copyright © 2017 Moxa Inc. All rights reserved.